Cloud migration services in India, with a cut-over you have rehearsed

Our cloud migration services in India move websites, applications and databases off shared hosting, office servers or another cloud. Every move has an assessment, a cost model, a tested cut-over and a way back if something goes wrong.

  • Free migration call
  • Custom quotation, never a fixed package
Empty warehouse with packed moving crates and a red strap
  • Assessment
  • Cut-over plan
  • Rollback

Worked with

  • Fortune Group
  • Classify-X
  • Aim Campus
  • Ek Inch
  • Signum Academy

Problems we solve

Has your current hosting become the thing everyone works around?

Businesses rarely migrate for fun. They move because the old set-up is slow, risky or expensive, and putting it off makes the move harder.

  1. 01

    Shared hosting that can't keep up

    The site slows down on busy days, and the host won't allow the software versions your developers need.

  2. 02

    A server in the office cupboard

    Business software runs on one machine with ageing disks, patchy power and a backup nobody has tested.

  3. 03

    Fear of downtime

    Everyone agrees the move is needed, but nobody wants to be the one who breaks orders or admissions.

  4. 04

    Costs with no clear picture

    Nobody can say whether the cloud will cost more or less than today, so the decision keeps slipping.

Our solution

A migration planned like a house move, not a gamble

We list what you own, decide what moves and how, practise the move, then carry it out at a quiet hour with a way back.

  • Know what you're moving

    An inventory of applications, databases, files, cron jobs, email and DNS, including the bits nobody remembered.

  • Cost before commitment

    A monthly cost model for the new set-up, compared with what you pay today, before anything moves.

  • Rehearse, then cut over

    A full test migration first, then a timed cut-over with a written rollback plan and checks after the switch.

Migration services

What a cloud migration includes

Each move uses the parts it needs.

Not sure where to start?

We'll help you pick what to build first and phase the rest.

01 / 066 included

Migration assessment

We map every application, database, file store, scheduled job, integration and domain, note dependencies and risks, and recommend what to move, change or retire.

  • Application inventory
  • Dependency mapping
  • Data volumes
  • Risk register
  • Move, change or retire
  • Written assessment
02 / 066 included

Target design and cost model

The new environment designed around your workload, with a monthly cost estimate for each option so the decision is made on numbers, not guesses.

  • Target architecture
  • Region and data location
  • Sizing from real usage
  • Monthly cost model
  • Security baseline
  • Backup design
03 / 066 included

Shared hosting and VPS moves

Websites and PHP, Node.js or Python applications moved off cPanel, shared hosting or a single VPS onto cloud infrastructure with proper backups and deployments.

  • Website and app files
  • MySQL and PostgreSQL
  • Email and DNS planning
  • SSL certificates
  • Cron jobs
  • Deployment pipelines
04 / 066 included

Office and on-premise servers

Business applications, databases and file shares moved from servers in your office or a local data centre, with VPN or private access for systems that must not be public.

  • Application servers
  • Database servers
  • File shares
  • VPN and private access
  • Licence checks
  • Network planning
05 / 066 included

Cloud-to-cloud and account moves

Workloads moved from one cloud provider to another, or out of an account owned by a former vendor into one in your own name.

  • Provider-to-provider moves
  • Account ownership transfer
  • Storage transfer
  • Database replication
  • DNS changes
  • Old account clean-up
06 / 066 included

Cut-over, rollback and tuning

A timed cut-over plan with owners for each step, a rollback trigger agreed in advance, checks after the switch and tuning in the weeks that follow.

  • Rehearsal migration
  • Cut-over runbook
  • Rollback plan
  • Post-move checks
  • Performance tuning
  • Decommissioning

What you get

What changes after a planned migration

The same business, on footing you can rely on.

  • Tested backups

    Restores proven, not assumed.

  • Room to grow

    Capacity that scales with demand.

  • Known running cost

    A monthly cost you saw before moving.

  • Fewer moving parts

    Unused systems retired on the way.

  • Repeatable deploys

    Releases through a pipeline, not FTP.

  • Accounts in your name

    Access and documents handed over.

Why us

Why businesses plan their move with Zero One Creation

  • We read the code too

    Our developers can fix the hard-coded paths, old libraries and config files that stall many moves.

  • We run production systems

    Our own products, including Classify-X on AWS, are live systems we operate every day.

  • Rollback is part of the plan

    Every cut-over has a written way back, agreed before the move starts.

  • Clear written scope

    An assessment, a plan and a customised quotation before work starts.

Tell us where your systems live today, and we'll outline what a safe move looks like.

A free migration call, then a written assessment and a customised quotation.

Our approach

How we run a cloud migration

Open each step to see what it covers.

  1. 01.Assess

    Inventory of applications, data, integrations and domains, with risks and dependencies written down.

  2. 02.Plan and cost

    Target design, monthly cost model, migration order and the rollback trigger for each step.

  3. 03.Build the landing zone

    The new environment set up as code, secured and tested before it carries real traffic.

  4. 04.Rehearse

    A full test migration with real data, timed, so we know how long the real cut-over will take.

  5. 05.Cut over

    The move at an agreed quiet hour, DNS switched, checks run and the old system kept ready as a fallback.

  6. 06.Tune and retire

    Performance and cost tuned in the following weeks, then the old environment shut down.

Common situations

Where migrations usually start

Most cloud migration projects begin with one of these.

  • The hosting renewal is due

    What you notice
    A large renewal invoice arrives, and it feels like the moment to move.
    How we fix it
    A quick assessment and cost model, so the renewal decision is made with real numbers.
  • The office server is failing

    What you notice
    Disk warnings, slow responses and a server well past its warranty.
    How we fix it
    Data copied off first, then a planned move of applications to the cloud.
  • A vendor holds the keys

    What you notice
    The application runs in an account owned by an agency you no longer work with.
    How we fix it
    A move into an account in your name, with access and documentation handed over.
  • The app needs more than hosting

    What you notice
    The code is so old that moving it as-is would carry every problem along.
    How we fix it
    A combined plan: migrate what can move now and modernise the rest in phases.

Tools

Tools we use to move systems

Chosen for the data and downtime each move can tolerate.

Destination
AWSDockerECSAmazon RDSAmazon S3
Data transfer
AWS DMSpg_dump and restoremysqldumprsyncS3 sync
Infrastructure as code
TerraformAWS CDK
Traffic and DNS
Route 53CloudFrontLoad balancers
Checks and monitoring
CloudWatchUptime checksLog comparison

Options

Planned migration, quick lift and shift, or stay put?

How the realistic choices compare.

Planned migration, quick lift and shift, or stay put?
CriteriaPlanned migrationQuick lift and shiftStay on current hosting
Downtime riskLow, rehearsed with rollbackHigher, often found on the dayNone now, rising over time
Running costModelled before the moveOften higher than expectedKnown, but may hide risk
Old problemsFixed or retired on the wayCarried acrossStay where they are
Effort up frontAssessment and rehearsalMinimalNone
Best forBusiness-critical systemsSimple, stateless websitesSystems due to be replaced soon

If the application itself needs rework, see our legacy software modernization service.

Who we help

Migrations we plan for different businesses

Every sector has a different quiet hour and a different system it can't lose.

  • Manufacturers

    Office servers running ERP, Tally and shared drives.

    See the work
  • Schools and coaching institutes

    Portals and LMS moves timed around exams and admissions.

    See the work
  • Online stores

    Store back ends and media moved between sale periods.

    See the work
  • Clinics and labs

    Booking and report systems moved with access controls in place.

    See the work
  • Professional firms

    Client portals and file servers moved to cloud storage.

    See the work
  • SaaS products

    Provider or account moves without breaking customers.

    See the work

How we work together

Three ways to work with us

Every engagement starts with a written proposal and a customised quotation.

  • Assessment only

    Inventory, risks, target design and cost model, which you can carry out with any team.

    Best for: Deciding whether to move

  • Full migration

    Assessment, landing zone, rehearsal, cut-over and tuning.

    Best for: Business-critical systems

  • Migration plus support

    The move, then ongoing cloud support, cost reviews and changes.

    Best for: Teams without in-house DevOps

Guide

Cloud migration for Indian businesses: a practical guide

Start with an honest inventory

Most migration surprises come from things nobody listed: a scheduled job that sends invoices at midnight, a script that writes to a local folder, an old subdomain still used by a partner. Walk through every system and ask what it talks to.

Note data sizes too. Moving a few gigabytes is quick; moving several terabytes needs a different method and more time.

Rehost, replatform or rebuild

Rehosting moves an application as it is. Replatforming makes small changes on the way, such as moving the database to a managed service or files to object storage. Rebuilding changes the application itself.

Most businesses replatform: it fixes the riskiest parts without the cost of a rewrite. Rebuilding belongs in a separate modernisation plan, done in phases.

Build a cost model before you move

Cloud costs depend on compute, storage, databases, data transfer, backups and support. Estimate each from your current usage and compare the total with what you pay today, including the hidden cost of staff time and risk.

Some workloads cost more in the cloud than on a cheap server. The model shows this before you commit, not after the first invoice.

Choosing where your data lives

Cloud providers have regions in India, which keeps latency low for Indian users and helps when contracts or data protection expectations ask for data to stay in the country.

Decide this early. Moving data between regions later is a second migration.

Planning around email and DNS

Shared hosting often bundles email, DNS and the website together. Moving the website without a plan for email can stop mail arriving. Separate them first and lower DNS record lifetimes a few days before the switch.

Keep a list of every DNS record before changing anything, so it can be restored if needed.

Rehearse the migration

Run the whole migration once in a test environment with a recent copy of real data. Time each step, check the application works end to end and write down everything that went wrong.

The rehearsal turns the cut-over from a guess into a checklist with known timings.

The cut-over and the rollback

Choose a quiet hour, freeze changes, take a final copy of the data, switch traffic and run your checks. Agree in advance what would trigger a rollback and who decides.

Keep the old environment running, untouched, until the new one has proven itself. Rolling back is only possible if there is something to roll back to.

Databases need special care

Small databases can be exported and imported during a short maintenance window. Larger or busier ones may need replication, where the new database stays in sync with the old one until the switch.

Check character sets, time zones and database versions; small differences cause odd bugs after the move.

After the move

The first few weeks show real performance and cost. Watch error rates, slow pages and the daily bill, then resize what is too big or too small.

Only shut down the old environment once backups on the new one have been restored successfully.

What affects the cost of a cloud migration

Effort depends on the number of applications and databases, data volume, how much downtime is acceptable, how old the software is, integrations to reconnect and whether code changes are needed. Cloud usage is billed separately by the provider.

We don't publish fixed prices or packages. After an assessment call, we send a written proposal with a customised quotation.

Before you talk to us

Frequently asked questions

Will our website or application go down during the migration?

Most moves need a short maintenance window at a quiet hour. Larger systems can use replication to keep it short. We agree the window with you in advance.

What happens if something goes wrong on the day?

We follow the rollback plan agreed beforehand. The old environment stays untouched until the new one is proven, so switching back is possible.

Can you move us off shared hosting or cPanel?

Yes. We move websites, databases and scheduled jobs, and plan email and DNS separately.

Can you move servers from our office to the cloud?

Yes, including business applications, databases and file shares, with private access for systems that should not be public.

Will the cloud cost more than our current hosting?

Sometimes it does. The cost model shows the expected monthly cost before you decide, so there are no surprises.

Do you only migrate to AWS?

AWS is where we do most of our work. If another provider suits your situation better, we'll discuss it during the assessment.

Can you move our application out of a former vendor's account?

Yes, with their cooperation for access. The new account is in your name, with access and documentation handed over.

Do we have to rewrite our software to move it?

Usually not. Most applications move with small changes. If parts need rework, we plan that separately as modernisation.

How do you keep data safe during the move?

Data travels over encrypted connections, access is limited to named people and copies are removed once the move is complete.

Can you migrate Tally or other desktop software?

It depends on the software's licence and hosting options. We check this in the assessment and suggest the safest route.

How much do cloud migration services cost?

It depends on the number of systems, data volume, acceptable downtime and code changes. We don't publish fixed prices; we send a customised quotation after an assessment call.

Contact us

Tell us what you need to move, and where it lives now.

Share a few details about your systems. An engineer reviews every enquiry and gets back to you to arrange a call.

We use your details only to reply to this enquiry. See our privacy policy.